Home Tour Physics Chemistry Earth Science Environment Scams Lesson Plans
Introduction Ore Processing Fire Assaying

Previous The Activity: Procedure Next
The model heap is assembled (bottom to top) from half of a large clamshell container (Styrofoam plate), half of a small clamshell container with collection pipes (straws) inserted, coffee filter, heap of ore; all placed at a slant for gravity feed on top of the other half of the large clamshell container.
  1. Prepare the leach pad by punching holes in the Styrofoam bowl. Punch holes up the side on one side so the solution can drip out of the side of the tilted apparatus. The bowl with holes in represents the pipes with holes in that lead the solution with the dissolved metal to the collection troughs. (Alternatively, use a round tooth pick to punch 4 holes at the bottom of half a small Styrofoam "clam shell" sandwich container. Put 1.5" pieces of coffee stirrer straws into the holes to simulate the pipes that carry the gold bearing solution.)
  2. Place filter paper in bowl to keep ore rock in the bowl. The filter paper represents the rock that covers the perforated collection pipes.
  3. Build the leach heap by putting the mixture of crushed rock and cupric sulfate into the bowl lined with the coffee filter.
  4. Place the bowl with the crushed rock on a Styrofoam plate. This plate represents the plastic liner at the bottom of the leach heap. The impermeable clay layer is represented by the worktable.
Previous The Activity: Procedure Next


Home Tour Physics Chemistry Earth Science lEnvironment Scams Lesson Plans